Design documentation for Jaskowa Dolina

Design documentation for Jaskowa Dolina

Preparation of design documentation with authors supervision for task entitled "Construction of Jaskowa Dolina retention reservoir"

Antea Group is responsible for preparing design documentation for the investment entitled: "Construction of the Jaśkowa Dolina retention reservoir in Gdańsk". The investment consists in the construction of a retention tank aimed at capturing and temporarily retaining rainwater during heavy rains in the city of Gdańsk. Besides, every day the area around the reservoir will play a recreational role for the inhabitants of the city.

As part of the investment in question, it is planned, among others:

  • Purification and deepening of the existing reservoir,
  • Construction of hydrotechnical structures supplying and discharging water to the retention reservoir,
  • Creation of a viewing terrace from the side of Jaskowa Dolina Street,
  • Installation of a fountain and a floating island to support biological treatment of water.